Cheyenne Bond Page

  CHEYENNE TRADITIONAL BOND INFORMATION

CHEYENNE UPDATE

7/12/2017 – Summer construction work is on schedule at Cheyenne. We’ve added photos of the work underway in the front lot, so you can see what we’ve been up to! The goal is to have most of the demolition done before students return in the fall, to minimize disruption to the school

  BOND PROJECT INPUT FORM

Your input is important to this process. Please use this form to share your comments, questions and concerns. While we are not able to respond to every submission individually, we will read all of them to identify the most common or pressing themes, which may be addressed in a public forum or in our FAQ sections. Thank you.

If you wish to address a specific school site, please indicate that in your comments.


 
SIGN UP FOR WEEKLY UPDATES
 CONSTRUCTION - CHEYENNE

Existing Site
    • PNG Download (Updated 4/27/17)
Site Plan
    • PDF Download (Updated 5/27/17)
Proposed Traffic Plan
    • PNG Download (Updated 4/27/17)
Proposed Gym Floor Plan
     • PNG Download (Updated 6/20/17)
Proposed Lab Locations
    • PNG Download (Updated 5/1/17)
Science Labs
    • PDF Download (Updated 5/23/17)
Proposed Gym Exteriors
    • PNG Download (Updated 5/23/17)
Existing Administration Area
    • PNG Download (Updated 4/27/17)
Proposed Administration Area
    • PNG Download (Updated 4/27/17)
Site Logistics
    • PDF Download (Updated 5/11/17)